  •  Switch lines have continuity in av bay
  •  Switches have continuity in body tube and are both set to off
  •  Charge lines have continuity to the end of the ribbon cables through the bulkhead
  •  Attach ematches (a twisted pair of two per deployment line) to ribbon cables, labeled 1 and 2 per cable
  •  Eggtimer Quark set to 1s drogue delay and 1000 ft main deploymentdeployment – NOTE FOR FUTURE: both computers' main should not be the same altitude for most configurations,  blowing two charges at once is bad
  •  Perfectflite set to 1s drogue delay and 1000 ft main deployment
  •  Attach diplole and GPS antennae
  •  Plug BRB battery in
  •  Power on ground Baofeng(s) and start APRS decoder(s)
  •  BRB sending APRS packets
  •  BRB has lock, may need to face body tube towards the sky
  •  Plug DB9 cable from av bay into body tube bulkhead, take not of which connector is used, should be marked on the top of the bulkhead with a 'D' for deployment
  •  Plug switch connectors in, one pair should go to the "gold" wires and the other pair to the remaining wires
  •  Insert av bay into body tube
  •  Connect DB9 ribbon cables to top and bottom bulkheads, should be in the labeled connectors
  •  When rest of rocket is ready, insert ematches into blackpowder and tape over
  •  Arm on pad