Avionics Launch Day Checklist
Avionics Launch Day Checklist
- Switch lines have continuity in av bay
- Switches have continuity in body tube and are both set to off
- Charge lines have continuity to the end of the ribbon cables through the bulkhead
- Attach ematches (a twisted pair of two per deployment line) to ribbon cables, labeled 1 and 2 per cable
- Eggtimer Quark set to 1s drogue delay and 1000 ft main deployment – NOTE FOR FUTURE: both computers' main should not be the same altitude for most configurations, blowing two charges at once is bad
- Perfectflite set to 1s drogue delay and 1000 ft main deployment
- Attach diplole and GPS antennae
- Plug BRB battery in
- Power on ground Baofeng(s) and start APRS decoder(s)
- BRB sending APRS packets
- BRB has lock, may need to face body tube towards the sky
- Plug DB9 cable from av bay into body tube bulkhead, take not of which connector is used, should be marked on the top of the bulkhead with a 'D' for deployment
- Plug switch connectors in, one pair should go to the "gold" wires and the other pair to the remaining wires
- Insert av bay into body tube
- Connect DB9 ribbon cables to top and bottom bulkheads, should be in the labeled connectors
- When rest of rocket is ready, insert ematches into blackpowder and tape over
- Arm on pad
, multiple selections available,
Related content
Avionics IREC 2022 Schedule
Avionics IREC 2022 Schedule
More like this
Avionics TODO
Avionics TODO
More like this
L1 Launch Checklist
L1 Launch Checklist
More like this
Rocket List - Triton
Rocket List - Triton
More like this
Deployment Mod (Brainsor)
Deployment Mod (Brainsor)
More like this
IREC Design Review SOP
IREC Design Review SOP
More like this