Semester 2
Important Dates:
March 6-13 Spring Break
April 27 Final Exams Start
Assignee / Action Item / Description | Manufacturing Steps: | Date Assigned: | Complete By: | Completion Date: | Comments: |
---|
- Identify potential Team Names
- For those in Structures and Avionics, (but not limited to!) start developing initial OpenRocket models.
- Brainstorm potential airbrake designs
- Reach out to Aero Team about Glider
- 360 Camera Research
- Reaction Wheel Research
- Avionics: Look into AV boards that might be capable of apogee detection, charge deployment, and servo/worm gear/etc operation for airbrakes and glider
Everyone:
- Sign in to the wiki using your RIT email.
Modeling/Simulation:
- Produce a finalized OpenRocket model, submit to James ASAP, goal is to have model reviewed and finalized by Saturday.
Avionics:
- Decide whether or not doing the collaborative board with the Avionics team is worth pursuing (highly recommend it!)
CAD Designer:
- 1. Design the body tube in this link.
- 2. Design 1/4" bulkheads.
- 3. Design coupler tubes from this link.
Website/Media Designer:
- Add current team member list to website page.
Presentation Designer:
- Create skeleton CDR slides (literally just copying PDR over and renaming to CDR will work for now)
BOM Maker:
- Add 1 roll of Hatchbox PLA 3d printer filament to BOM (look up on amazon). Specify amount to be 0.5kg, so total cost will be half the cost of one roll.
Numbers Person:
- Read through this link to understand calculations for parachutes.
Assign tasks to people/groups. | 1/28/22 | Ongoing | Ongoing | We need to get groups working on specific action items. | |
CAD Entire Rocket | 1/29/22 | ASAP | Teams need to work together to get this together. | ||
Add and Highlight BOM Parts to Order | 1/29/22 | Ongoing | Ongoing | Confirm parts with group, Domenic, and highlight | |
We Need Money Guys. | Search your couch cushions, sell your belongings, beg on the street. | 1/29/22 | Ongoing | Ongoing | $$$$$$$. Don't sell your kidney. You might need that. |
Avionics Bay Sled | Determine materials, Order materials, 3D print/laser cut, assemble/glue | 1/24/22 | 3/5/22 | Avionics group should finalize details and CAD soon. Make parts | |
Finalize Motor for Air brakes and order it | Re-simulate motor and selection | 1/24/22 | 2/05/22 | ||
Order Avionics | N/A | 1/24/22 | ASAP | Proton 2x, Batteries, transmitter etc. see BOM | |
Order & finalize parachute, eyebolts, shockcord, streamer | CAD, Calculate chute size, attach streamer | 1/28/22 | 3/5/22 | Structures team needs to figure out the parachute size needed and find a best fit for the rocket. | |
Solder Avionics boards | Very carefully solder connections to boards | 1/28/22 | 3/5/22 | BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!..... | |
Glue Black Powder Charges | Glue in position to successfully deploy parachute | 1/28/22 | End of Av Bay manufacturing | ||
Wire avionics bay | Connect batteries, switches, pwm board, DC motor, and set up wires for black powder charges. | 1/28/22 | End of Av Bay Manufacturing | Do not directly connect source and ground. You will have a bad time. Decide on how we are going to secure everything within the av bay. | |
Drill holes for Switches | (Potentially) Create jig for alignment. | 1/28/22 | After wiring/installation of parts | ||
Order electronic parts for Air brakes | Get PWM module, DC Motor, Battery, flyback diode. | 1/28/22 | ASAP | ||
Finalize materials needed for air break | Finalize parts list and stock. Put needed things in BOM | 1/28/22 | ASAP | ||
Rods/ lead screws | CAD, find what is needed ^ | 1/29/22 | CAD ASAP | ||
Motor attachment to air break | Figure it out, CAD, assembly/install^ | 1/29/22 | CAD ASAP | ||
Order materials for air break | N/A^ | 1/28/22 | ASAP | Highlight the items | |
Manufacture air break | CAD and Manufacture | 1/28/22 | CAD ASAP 3/20/22 | Airbrake group is on this | |
Make and wire up black powder charges | We need to first determine the materials we need to make this. | 1/28/22 | Before we close up the rocket | We should find someone who knows how to do this. | |
Get switch for avionics system | We also need to install it . | 1/28/22 | 3/5/22 | What switch is being used? | |
Nose Cone | Make and glue bulkhead, order part | 1/29/22 | 3/5/22 | ||
Four Plywood Bulkheads | CAD, order stock, cut, epoxy to tubes, FEA on top bulkhead | 1/29/22 | CAD ASAP 3/5/22 | 2/5/2022 | |
Look into avionics alternatives | Substitute Eggtimer parts | 1/29/22 | ASAP | ||
Update wiring diagram | N/A | 1/29/22 | ASAP | Update with new parts as needed | |
Airbreak Calculations | FEA, Assembly, joints, snatch force | 1/29/22 | ASAP | ||
Assemble "All or nothing" parachute system | 1/29/22 | 3/5/22 | |||
Chute Bulkhead | CAD, FEA, I bolts, order stock, manufacture, epoxy to tubes | 1/29/22 | CAD ASAP 3/5/22 | 2/5/2022 | |
Camera Bulkhead | CAD, FEA, determine size, order stock, manufacture, mount camera | 1/29/22 | CAD ASAP 3/5/22 | ||
Mount Camera to bulkhead | ^ | 1/29/22 | 3/5/22 | ||
Set Screw or L bracket into rods for AV Bay placement | Determine how its going to work, CAD, order parts, attach | 1/29/22 | CAD ASAP 3/5/22 | ||
Make jig for air break? | 1/29/22 | ||||
Airbreak Webbing | CAD, Order, "Gromit" it to airbreak | 1/29/22 | Button head screw, "Gromit", Washers | ||
CAD and print jig for cutting blue tube | 1/29/22 | ASAP | For airbreaks | ||
Figure out Airbrake Assembly order and integration | 1/29/22 | ASAP | |||
CAD and 3D Print Engineering Camera Casing | CAD Integration and 3D print | 1/29/22 | CAD ASAP 3/5/22 | ||
Order parts for engineering camera | 1/29/22 | ASAP | |||
Make jig and cut blue tube | Cut blue tube for engineering camera | 1/29/22 | 3/5/22 | ||
Manufacture Engineering Camera system | Wire up, install, epoxy | 1/29/22 | 3/5/22 | ||
CAD Scenic Camera | CAD and integrate CAD into rocket | 1/29/22 | ASAP | ||
Order parts for scenic camera | 1/29/22 | ASAP | |||
Manufacture Parts for scenic camera | 1/29/22 | 3/5/22 | |||
Assemble scenic camera | 1/29/22 | ||||
Fins CAD | Have CADed fins in model | 1/29/22 | CAD ASAP | ||
Order stock and manufacture fins | Send to "Send cut send" | 1/29/22 | |||
Attach Fins | 1/29/22 | ||||
Calculations FEA for motor | 1/29/22 | Done? | |||
CAD/Assembly for Rocket Motor | 1/29/22 | CAD ASAP | Assembly for everything rocket motor | ||
Manufacture thrust plate | Order stock and cut | 1/29/22 | 3/5/22 | ||
Order stock for Rocket Motor | 1/29/22 | ||||
Set Up the Scenic Camera | No manufacturing | 2/19/22 | 2/19/22 | Donovan's gonna do it | |
Have Fun | idk | -∞ | ∞ | ∞ | Get to work |