Structures

Last Week

  • FDR
  • Start sanding tubes
  • 1 bulkhead finished
  • If fiberglass is here then layup nose cone
  • Cut tubes to length
  • redo bulkhead FEA 
  • Research into layups for learning
  •  

This week

  • Machine bulkhead x2
  • Sand tubes to length
  • Finish tubes with epoxy layer 
  • Publish schedule
  • edit action items list
  • confirm OR stuff
  • Look into fin stabilizing options Nathan Aquilio (RIT Student) 

Next week

  •  IREC 101


Payload

Last week

  • Making parashot bay
  • Darwin progress- joe approved/redesign 
  • Order part with approval
  • FDR SLIDEs IN
  •  

This week

  • Continue on parashot bay
  • Assemble Darwin

Next week

  •  Continue Darwin 
  • And loose end stuff
  • General GS stuff


Avionics

Last week

  • Order ave bay parts
  • FDR SLIDES IN
  • Waiting for FG tube
  • All flying electronics are in

This week

  • Xbee module Worked on

Next week

  • Assembly of bay
  • Vacuum test flight computers
  • MS561 barometer/temp sensor worked on


Umbilical

Last week

This week

  •  

Next week

  •  


Recovery

Last week

  • Order stuff

This week

  • Organize all ordered components
  • Order/locate swivel links
  • Enjoy Spring Break

Next week

  • Start assembling
  • Start cutting


Prop

Last week 

  •  

This week

  • Pick motor
  • Discuss where to purchase motor

Next week