High Level Requirements
Output:
The controls system must:
- Be able to control the state of at least four solenoids
- Be able to control the state of at least two linear actuators
- Be able to drive the state of at least two linear actuators
- Be able to measure the state of at least two linear actuators
- Be able to control the state of at least one igniter
Input:
The data acquisition system must:
- Measure the state of at least four pressure transducers
- Measure the state of at least two flow meters
- Measure the state of at least one load cell
- Measure the state of at least one thermocouple