Semester 2

Important Dates:

March 6-13 Spring Break

April 27 Final Exams Start

Assignee / Action Item / DescriptionManufacturing Steps: Date Assigned:Complete By:Completion Date:Comments:
Assign tasks to people/groups. 
1/28/22Ongoing OngoingWe need to get groups working on specific action items. 
CAD Entire Rocket
1/29/22ASAP
Teams need to work together to get this together.
Highlight BOM Parts to Order
1/29/22OngoingOngoing Confirm parts with group, Domenic, and highlight 
Avionics Bay SledDetermine materials, Order materials, 3D print/laser cut, assemble/glue1/24/223/5/22
Avionics group should finalize details and CAD soon. Make parts
Finalize Motor for Air brakes and order itRe-simulate motor and selection 1/24/222/05/22

Order AvionicsN/A1/24/22ASAP
Proton 2x, Batteries, transmitter etc. see BOM
Order & finalize parachute, eyebolts, shockcord, streamerCAD, Calculate chute size, attach streamer1/28/223/5/22
Structures team needs to figure out the parachute size needed and find a best fit for the rocket.
Solder Avionics boardsVery carefully solder connections to boards1/28/223/5/22
BE VERY CAREFUL NOT TO BURN IT PLEASE!!!!.....
Glue Black Powder ChargesGlue in position to successfully deploy parachute1/28/22End of Av Bay manufacturing

Wire avionics bayConnect batteries, switches, pwm board, DC motor, and set up wires for black powder charges.1/28/22End of Av Bay Manufacturing

Do not directly connect source and ground. You will have a bad time.

Decide on how we are going to secure everything within the av bay.

Drill holes for Switches(Potentially) Create jig for alignment.1/28/22After wiring/installation of parts

Order electronic parts for Air brakesGet PWM module, DC Motor, Battery, flyback diode.1/28/22ASAP

Install Motor next to airbrakesAlign correctly.1/28/22End of Av Bay Manufacturing

Finalize materials needed for air breakFinalize parts list and stock. Put needed things in BOM1/28/22ASAP

Order materials for air breakN/A1/28/22ASAP
Highlight the items
CAD/Manufacture air break N/A1/28/22CAD ASAP 3/20/22
Airbrake group is on this
Manufacture Thrust PlateN/A1/28/223/20/22
Structures on this
Cut and Glue Fins N/A1/28/223/20/22
Structures on this
Make and wire up black powder chargesWe need to first determine the materials we need to make this.1/28/22Before we close up the rocket
We should find someone who knows how to do this. 
Get switch for avionics systemWe also need to install it .1/28/223/5/22
What switch is being used? 
Nose ConeMake and glue bulkhead, order part1/29/223/5/22

Four Plywood BulkheadsCAD, order stock, cut, epoxy to tubes, FEA on top bulkhead1/29/22

CAD ASAP

3/5/22



Look into avionics alternativesSubstitute Eggtimer parts 1/29/22ASAP

Update wiring diagram N/A1/29/22ASAP
Update with new parts as needed
Airbreak Calculations FEA, Assembly, joints, snatch force1/29/22ASAP

Assemble "All or nothing" parachute system
1/29/223/5/22

Chute BulkheadCAD, FEA, I bolts, order stock, manufacture, epoxy to tubes1/29/22

CAD ASAP

3/5/22



Camera Bulkhead CAD, FEA, determine size, order stock, manufacture, mount camera1/29/22

CAD ASAP 

3/5/22



Mount Camera to bulkhead ^1/29/223/5/22

Set Screw or L bracket into rods for AV Bay placementDetermine how its going to work, CAD, order parts, attach 1/29/223/5/22































Have Fun idk -∞Get to work 