Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 64 Next »

SubteamAction ItemsFurther Action ItemsFUrther Further action itesm
Structures
  • Finish nose cone
    • bondo
    • sand
    • poly
  • drill holes
    • need jig for payload
    • vent holes in parachute bay
    • shear pins
    • vent holes in av bay
    • screw holes for couplers
  • fix tip
  • keying tabs
  • stability analysis
  • Drill payload holes
  • drill vent holes
  • drill screw holes
  • drill shear pin holes
  • prime nose cone
  • reweigh EVERYthing
  • (smile) 
  • Weigh everything
  • tape off all holes and aluminum for paint
  • screws in nosecone
  • get Alex RGB code 
  • get rocket painted 
  • keying geometry
  • packing list
Avionics
  • get new connectors for BRB battery
  • make connectors
  • make wiring harness
  • vacuum test avionics
  • cut av bay
    • route delrin end caps
    • laser support bars
    • test brackets for batteries and connect
    • print screw switch brackets 
    • print backplane battery bracker
    • integration guide
  • order tamiya
  • Get FRS radio
  • Recut COTS sled
  • Cut key
  • Design and print PROMPT mount
  • Vacuum test
  • Design and print d-sub bracket
  • Set pinout
  • Bridge breakouts
  • Recut COTS sled
  • strain relief bracket (dsubs)
  • debur, sand, and glue bay
  • keying geometry 
  • test prompt mount
  • RRC3 battery test
  • integration testing, practice
  • edit last years procedure and improve
  • packing list
Backplane
  • fix radio module
  • order power module
  • putting altimeter in place of backplane
  • need weight for test launch 
  • flying the battery for backplane
  • Testing RFM range at test launch 
  • RFM code
  • Design and cut small altimeter sled
  • waiting for parts
  • dead mass for test flight
  • modules in
  • modules need to be assembled 
  • figure out antenna splitter situation
  • Range test RFM
Payload
  • Av bay
    • BRB needs standoffs and mount
    • Print SABOT
    • print FC mount and add heat inserts
    • print battery mount and mount x2
    • print scrap mount and mount
    • make dummy scrap with ultralogger -Jim
    • 3D print screw switch mount
    • tap support bar
    • 3D print antenna clips
    • reduce weight in chute bay
    • Assemble and wire COTS Av -Louis
    • Write procedures
  • Print sabot
  • reprint scrap mount
  • hole jig
  • integrate new BRB battery 
    • make new mount
    • Reintegrate other battery
  • integration procedures
  • Reprint sabot
  • print final scrap mount
  • Integrate BRB Battery
  • write procedure
  • payload 2 being machined 
  • weld payload 2 bay
  • test electronics and recovery this weekend
  • do software 
  • test load calls and payload opening/closing
  • talk to consultant James about recovery
Recovery
  • Deployment testing Thursday night 
  • Assemble recovery harness
  • test remaining TD-2s
  • Main parachute bag test
    • how easy does it stay in there?
    • how easy does it pull out
  • Write and PRACTICE integration procedures 
  • Figure out stringing 
  •  
  • Deployment testing
  • finish procedures
  • main pull testing 
Poster

done
Test Flight

Pros

Cons
Other

  • No labels