Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Date

Attendees

Discussion items

ItemsNotes
Last week's action items
 Reminders
  •  Nice job on PDR last Saturday
  • Work session went well, continue that?
    • Thursdays worked well, maybe switch work session to those
    • Wait until after career fair
Deadline pushback
  • Likely going to need to push back design deadline from October 1st
    • EOD October 9th
      • Need PCB designed for DARWIN
      • CAD from Yev
Schedule CDR/FDR
  • Internal review (CDR replacement)
    • Thursday October 14th (or sometime that week)
    • We can also present at the IREC CDR if asked
  • FDR with rest of IREC team
    • CAN order parts and manufacture before FDR

Action items

  •  Dante Sivo (RIT Student) Ben Hyman (RIT Student) - get DARWIN mounting holes to Yev (dimensions at least by Saturday)
    • Impedance matching for SMA connector
    • Redo camera TX power switch to the one in SPICA
    • Use multiple sheets for clarity
    • Altium??
  • Will Merges (RIT Student) - figure out the JLCPCB sponsorship
  • Talk to Joe about trace impedance matching/Learn to do this
  • Work on DARWIN PCB design
  • Clean up DARWIN schematic formatting (break into multiple sheets)
  • Work on XBEE API passthrough for ground station
  • No labels