2021-09-27 Meeting Notes - VOID Payload

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

2021-09-27 Meeting Notes - VOID Payload

Date

Sep 27, 2021

Attendees

  • @Will Merges (RIT Student)

  • @Jonathan Russo (RIT Student)

  • @Billy Siegener (RIT Student) (Deactivated) 

  • @Ben Hyman (RIT Student)

  • @Aaron Chan (RIT Student) 

  • @Seth Davidson (RIT Student)

  • @Matthew Klein (RIT Student) 

  • @Dante Sivo (RIT Student)

Discussion items

Items

Notes

Items

Notes

Last week's action items

  • Start DARWIN PCB design - @Dante Sivo (RIT Student)

    • started it

    • 80% done with the schematic

    • get mounting hole locations to Yev

  • Continue CAD - @Yevgeniy Gorbachev (RIT Student)

    • not here this meeting, continuing CAD

  • Work Session - everyone

    • happened Thursday 9/23/21

  • Come up with DARWIN meaning

  • Submit NYSG BOM - @Will Merges (RIT Student)

    • done

 Reminders

  •  Nice job on PDR last Saturday

  • Work session went well, continue that?

    • Thursdays worked well, maybe switch work session to those

    • Wait until after career fair

Deadline pushback

  • Likely going to need to push back design deadline from October 1st

    • EOD October 9th

      • Need PCB designed for DARWIN

      • CAD from Yev

Schedule CDR/FDR

  • Internal review (CDR replacement)

    • Thursday October 14th (or sometime that week)

    • We can also present at the IREC CDR if asked

  • FDR with rest of IREC team

    • CAN order parts and manufacture before FDR

Action items

 @Dante Sivo (RIT Student) @Ben Hyman (RIT Student) - get DARWIN mounting holes to Yev (dimensions at least by Saturday)

Impedance matching for SMA connector: Talk to Joe
Redo camera TX power switch to the one in SPICA
Use multiple sheets for clarity
Altium??
@Will Merges (RIT Student) - figure out the JLCPCB sponsorship
Work on XBEE API passthrough for ground station