Date

Attendees



Discussion items

ItemWhoNotes
Updates from the past (2) weeks
  • Ground Station CAD nearly done
  • Payload chute bay lid nearly done, Grace Dertinger (RIT Alumni) manufacturing
  • payload internals printed by Matt
    • need the VTX/DARWIN sled printed again because DARWIN hole spacing changed
  • avionics bay manufacturing started
    • laser cutter rotary axis was off, fixed now
    • sent prints to Matt
Updates from the past (2) week
  • ran IEPE test on DAQ with waveform generator
    • results look good
    • fixed firmware bug, ENA register was not being written to correctly
    • IEPE and CL interfaces tested now, can't generate small enough signal (~5mV) to test fullbridges
    • tried to test fullbridge interface with load cell, saw a lot of noise (verified by o-scope), think the cabling was poor
  • did not hear back from Jeff about DARWIN lab access
  • putting together final BOMs of parts we still need






Action items