Item | Who | Notes |
---|
Updates from the past (2) weeks | | - Ground Station CAD nearly done
- Payload chute bay lid nearly done, Grace Dertinger (RIT Alumni) manufacturing
- payload internals printed by Matt
- need the VTX/DARWIN sled printed again because DARWIN hole spacing changed
- avionics bay manufacturing started
- laser cutter rotary axis was off, fixed now
- sent prints to Matt
|
Updates from the past (2) weeks | | - ran IEPE test on DAQ with waveform generator
- results look good
- fixed firmware bug, ENA register was not being written to correctly
- IEPE and CL interfaces tested now, can't generate small enough signal (~5mV) to test fullbridges
- tried to test fullbridge interface with load cell, saw a lot of noise (verified by o-scope), think the cabling was poor
- did not hear back from Jeff about DARWIN lab access
- putting together final BOMs of parts we still need
|
Updates from the past (2) weeks | | - emailed Jeff at CEMA lab
- should order ICs for NIGEL
- not here on Saturday (can't zoom)
|
Updates from the past (2) weeks | | - NIGEL
- going of lt spice PMOS simulation
- need parts, out of stock but we have some (Ben has them)
|
Updates from the past (2) weeks | | - want to review NIGEL schematics before starting
|
Updates from the past (2) weeks | | - ms5611 and bmi08x headers and C files in NIGEL
- started runcam protocol library
|
Plan for Saturday |
| - NIGEL schematic review
- want to get Joe over Zoom
- hold off on DARWIN until Ben here
- NIGEL documentation dump
- payload thermal testing / making the wiring harness
- RRC3 vaccuum testing
|