Date
Attendees
- Jake Halpern (RIT Student)
- Nathan Aquilio (RIT Student)
- Alex Speyer (RIT Student)
- Ryan Cross (RIT Student) (Deactivated)
- lst5581
- Kenny Kim (RIT Student)
- Brahm Soltes (RIT Student)
- James May (RIT Student)
Goals
Discussion items
Time | Item | Who | Notes |
---|---|---|---|
Action items
Structures
Last Week
- FDR
- Start sanding tubes
- 1 bulkhead finished
- If fiberglass is here then layup nose cone
- Cut tubes to length
- redo bulkhead FEA
- Research into layups for learning
This week
- Machine bulkhead x2
- Sand tubes to length
- Finish tubes with epoxy layer
- Publish schedule
- edit action items list
- confirm OR stuff
- Finalize masses
- explore nose cone lay up options Jake Halpern (RIT Student)
- Look into fin stabilizing options Nathan Aquilio (RIT Student)
Next week
- IREC 101
Payload
Last week
- Making parashot bay
- Darwin progress- joe approved/redesign
- Order part with approval
- FDR SLIDEs IN
This week
- Continue on parashot bay
- Assemble Darwin
Next week
- Continue Darwin
- And loose end stuff
- General GS stuff
Avionics
Last week
- Order ave bay parts
- FDR SLIDES IN
- Waiting for FG tube
- All flying electronics are in
This week
- Xbee module Worked on
Next week
- Assembly of bay
- Vacuum test flight computers
- MS561 barometer/temp sensor worked on
Umbilical
Last week
- Finished review of files, prepped for manufacturing
This week
- PCBs sent for manufacturing
- Components ordered
- Print aerodynamic shell
Next week
- Wait for components to arrive
Recovery
Last week
- Order stuff
This week
- Organize all ordered components
- Order/locate swivel links
- Enjoy Spring Break
Next week
- Start assembling
- Start cutting
Prop
Last week
This week
- Pick motor
- Discuss where to purchase motor
Next week
- Discuss where to purchase motor Brahm Soltes (RIT Student) @James