NIGEL Project Requirements

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

NIGEL Project Requirements

 

Category

Requirement

Rationale

Verification

Category

Requirement

Rationale

Verification

Deadline

We need to have hardware in hand by: Mar 31, 2022 

Software team needs ~5 weeks minimum to develop avionics software for board.

 

Hardware Capability

Withstand high temperatures (~120 F) indefinitely

Needs to function in New Mexico climate.

 

Hardware Capability

Measure altitude up to 10,000 feet minimum

NIGEL will fly in VOID, which is competing in the 10k category at IREC.

 

Hardware Capability

Receive GPS

Replace Big Red Bee as recovery tracking computer

 

Hardware Capability

Log telemetry

Store and pull data for a flight

 

Hardware Capability

Transmit telemetry

Track rocket during flight and after landing

 

Hardware Capability

Deploy charges (1A for 1s)

Replace COTS recovery altimeter

 

Hardware Capability

Supply power

Electronics need power

 

Hardware Capability

Indicator LEDs

Debugging