NIGEL Project Requirements
Category | Requirement | Rationale | Verification |
---|---|---|---|
Deadline | We need to have hardware in hand by: | Software team needs ~5 weeks minimum to develop avionics software for board. | |
Hardware Capability | Withstand high temperatures (~120 F) indefinitely | Needs to function in New Mexico climate. | |
Hardware Capability | Measure altitude up to 10,000 feet minimum | NIGEL will fly in VOID, which is competing in the 10k category at IREC. | |
Hardware Capability | Receive GPS | Replace Big Red Bee as recovery tracking computer | |
Hardware Capability | Log telemetry | Store and pull data for a flight | |
Hardware Capability | Transmit telemetry | Track rocket during flight and after landing | |
Hardware Capability | Deploy charges (1A for 1s) | Replace COTS recovery altimeter | |
Hardware Capability | Supply power | Electronics need power | |
Hardware Capability | Indicator LEDs | Debugging |