CVC 601 Step Coverage

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

CVC 601 Step Coverage


This process improves the aluminum step coverage in the CVC 601 over the standard cold process.

It is intended for 0.75-1.0 um.

 

Cold/ Hot Sputter Process

Setpoints

Cold/ Hot Sputter Process

Setpoints

Argon Flow

20sccm

Power

2000W

Pressure

5mT

Process Sequence

Time

Process Sequence

Time

Pre-sputter (shutter closed)

300s

Cold sputter (shutter open)

250s

Warm up (set heater timer for 17min)

See instructions in CVC 601 Manual

15min

Hot sputter (approximately 200°C)

1200s