IREC 2023 - COTS Avionics Master TODO

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

IREC 2023 - COTS Avionics Master TODO

Tests

Battery drain BRB (Result: 18h)
Battery drain RRC3 (Result: 15h)
Foxhunting BRB

Wiring

2x JST to BRB adapters
Replace backplane battery connector with XT-60
Backplane screw circuit
Replace backup small battery connectors with XT-30 (2x)

 

Bay Design

Fixes

@Donovan Barros (RIT Student) Shrink central connecting bar to accommodate backplane modules
@Donovan Barros (RIT Student) Add DE-9 holes for both downward-facing connectors
@Donovan Barros (RIT Student) Expand DE-9 holes to accommodate square-ish connector
@Donovan Barros (RIT Student) Check DE-9 connector dimensions to make sure they fit in the holes
@Donovan Barros (RIT Student) Update cut radii
@Donovan Barros (RIT Student) Change the dimensions of the BRB's battery inside the BRB model to match the larger battery
@Donovan Barros (RIT Student) Use shorter version of last year's battery holders (look cleaner)
@Yevgeniy Gorbachev (RIT Student) Saner battery layout
@Donovan Barros (RIT Student) Move RRC3s closer
@Donovan Barros (RIT Student) Resolve switch bar interference - move sleds around if necessary
@Donovan Barros (RIT Student) Move backplane up so the PEM nut doesn't stick out of the bay
@Donovan Barros (RIT Student) Correct sled height/width if slots moved
@Donovan Barros (RIT Student) Adjust slot corner radius to match tool (or we could just file it?)
@Donovan Barros (RIT Student) Add 1/8" charge lines to bulkhead CAD
@Donovan Barros (RIT Student) Add appropriately sized keep-out blocks to Fingertech screw switches
@Donovan Barros (RIT Student) Copy the RRC3 into the IREC 2023 Fusion project so we modify our copy instead of the library copy
@Donovan Barros (RIT Student) Add appropriately sized keep-out blocks to RRC3 terminal blocks
@Donovan Barros (RIT Student) Add appropriately sized keep-out blocks to D-sub breakouts
@Donovan Barros (RIT Student) Correct DE-9 breakout model
@Donovan Barros (RIT Student) Correct strain relief spacing
@Donovan Barros (RIT Student) Correct sled holes

Major additions/changes

@Donovan Barros (RIT Student) Design Finger Tech screw switch bracket (these are in)
@Donovan Barros (RIT Student) Redesign Big Red Bee bracket
@Donovan Barros (RIT Student) Look into mounting the screw switches to the COTS sled
@Donovan Barros (RIT Student) Design strain relief bracket for d-subs
@Donovan Barros (RIT Student) Design PROMPT mount
@Yevgeniy Gorbachev (RIT Student) CAD battery and a holder
@Yevgeniy Gorbachev (RIT Student) Adjust COTS sled layout
Join BRB to antenna directly
Add new battery (should end up close to the upper end cap)
Add hole in upper end cap for new battery connector
@Donovan Barros (RIT Student) Hole drilling jig
@Donovan Barros (RIT Student) Integration plan
@Yevgeniy Gorbachev (RIT Student) Figure out which battery for backplane
@Yevgeniy Gorbachev (RIT Student) Lay out radio module antennas
@Yevgeniy Gorbachev (RIT Student) Update PCBs from Altium
@Donovan Barros (RIT Student) Design updated long key

Finishing touches

Backplane module cutouts
Holes and fasteners
CHECK: Antenna hole aligned
CHECK: Antenna can be assembled
CHECK: Battery hole aligned
CHECK: Battery can be assembled

Manufacture

Prerequisites

Router bits
Superglue
@Donovan Barros (RIT Student) Schedule time for routing with Alex

Manufacturing (Test)

@Donovan Barros (RIT Student) Laser cut end caps
@Donovan Barros (RIT Student) Laser cut connecting bars
@Donovan Barros (RIT Student) Print BRB bracket
@Donovan Barros (RIT Student) Print small battery holders
@Donovan Barros (RIT Student) Print large battery holder

Manufacturing (Final)

@Donovan Barros (RIT Student) Machine upper end cap
@Donovan Barros (RIT Student) Machine lower end cap
@Donovan Barros (RIT Student) Machine connecting bar
@Donovan Barros (RIT Student) Machine connecting bar
@Donovan Barros (RIT Student) Machine center bar
@Donovan Barros (RIT Student) Finish BRB bracket
@Donovan Barros (RIT Student) Adjust or re-cut COTS sled
@Donovan Barros (RIT Student) Print PETG large battery holder
@Donovan Barros (RIT Student) Drill mounting holes, add nuts
@Donovan Barros (RIT Student) Sand (paint?) bay

Assembly

@Donovan Barros (RIT Student) Glue together components
@Donovan Barros (RIT Student) Drill holes in nosecone
@Donovan Barros (RIT Student) Drill vent holes in nosecone
@Donovan Barros (RIT Student) Drill holes in upper body tube
@Donovan Barros (RIT Student) Glue in key
@Donovan Barros (RIT Student) Glue in PROMPT mount