Sub team | Action Items | Blockers |
---|
| - Big Red Bee needs to be mounted Jonah
- Mount needs to be CADed
- Big Red Bee needs to be measured
- holes in walls added
- hardware added to assy
- 3d printed
- Flight computer mounts Riley
- Designed
- Heat inserts
- Put screws in
- Put holes in walls
- 3d print
- add heat inserts
- Battery mount bottom Hayden
- Designed
- Put holes in mounting plate
- Put hardware in assy
- 3d print/test
- Battery mount 2000 battery Hayden
- Design
- order hardware
- put screws in assy
- put holes in walls for mount
- Scrap mount Riley
- Designed
- Add nuts/hardware
- double check position
- Add hole in connector bars
- 3d print
- Order hardware
- Screw switches
- Screws on scrap
- Hole for scrap screw switches
-
- Manufacture Riley
- CNC training
- Make Support Bars
- Stock ordered/here
- Cut to length
- Mill top operation
- Mill side operation
- tap top
- tap bottom
- Manufacture Acrylic walls Jim
- Finish CAD model
- Make holes of all scrap connections in walls Josh
- Make hole for usb port Josh
- then double check
- Laser cut
- Clips Hayden
- cad
- 3d print
- order hardware
|
|
| - Design everything
- Order parts
- Send cut sent
- hardware
- extra servo
- Pivot plate
- Twist plate
- Mounting plate Hayden 2
- **Brakes 1 put in slack
- get trained
- make operation
- cut stock
- mill
- Testing
- 3d printed verison
- make metal version of brake and test!!
- Order
|
|
Recovery: Leo and Josh | - Snatch force
- Reefing
- location
- test
- test line cutters
- test zip tie holding ability
- order line cutters
- Chute bag
- Chute bay Grace
- Order
|
|
|
|
|
| - Final tweaks to SCRAP
- Order
| Blocked by motor testing |
Other |
|
|