/
Payload Master To Do

Payload Master To Do

Sub teamAction ItemsBlockers
  • Big Red Bee needs to be mounted Jonah
    • Mount needs to be CADed
      • Check with louis
    • Big Red Bee needs to be measured
    • holes in walls added
    • hardware added to assy
    • 3d printed
  • Flight computer mounts Riley
    • Designed
    • Heat inserts
    • Put screws in 
    • Put holes in walls
    • 3d print
    • add heat inserts
  • Battery mount bottom Hayden
    • Designed 
    • Put holes in mounting plate
    • Put hardware in assy
    • 3d print/test
  • Battery mount 2000 battery Hayden
    • Design
    • order hardware
    • put screws in assy
    • put holes in walls for mount
  • Scrap mount Riley
    • Designed
    • Add nuts/hardware 
    • double check position
    • Add hole in connector bars
    • 3d print
    • Order hardware
  • Screw switches 
    • Screws on scrap
    • Hole for scrap screw switches
    •  
  • Manufacture Riley
    • CNC training
    • Make Support Bars
      • Stock ordered/here
      • Cut to length
      • Mill top operation
      • Mill side operation
      • tap top
      • tap bottom
  • Manufacture Acrylic walls Jim
    •  Finish CAD model
    • Make holes of all scrap connections in walls Josh
    • Make hole for usb port Josh
    • then double check
    • Laser cut
  • Clips Hayden
    • cad
    • 3d print
    • order hardware

  • Design everything
  • Order parts
    • Send cut sent
    • hardware
    • extra servo
  • Pivot plate
    • counter boure
  • Twist plate
    • counter boure
  • Mounting plate Hayden 2
    • holes 
    • counter boure
  • **Brakes 1 put in slack
    • get trained
    • make operation
    • cut stock
    • mill
  • Testing
    • 3d printed verison
    • make metal version of brake and test!!
  • Order
    • bushings
    • hardware
    • dowels

Recovery: Leo and Josh
  • Snatch force
    • FEA FOS 9.6
  • Reefing
    • location
    • test
      • test line cutters
      • test zip tie holding ability
    • order line cutters
  • Chute bag 
    • research
    • make bag
    • test
  • Chute bay Grace
    • weld
  •  Order
    • chute bay stock
    • eye bolt



  • Final tweaks to SCRAP
  • Order
Blocked by motor testing
Other

Related content

4/6/2023 - 4/13/2023
4/6/2023 - 4/13/2023
More like this
Rocket List - Triton
Rocket List - Triton
More like this
12/22/2022
More like this
Avionics TODO
Avionics TODO
More like this
Action Items For Tuatara
Action Items For Tuatara
More like this
9/6/2022
More like this