Topic | Finished from Last Week | Blockers | Action Items for this Week |
---|
Structures | - Manufacture
- Finished setting up the x-winder
- more research into tensile testing of epoxy joints
- switched out squeegee for rubber
- Talked to jake about wind about some fancy stuff
- Design
- CAD started
- Basic structure finished
| - lost the cap to mandrel
- g-code troubleshoot
| |
Payload | - At weekly meeting decided passive payload deployment and changed drogue to streamer to avoid collision/tangle
- Made general rocket layout
- Rought Electronics BOM
- Payload 101
| - Need eyes for design not really a blocker
| - Working on rough layout of CAD this Saturday
- Reduce electronics
- Sin wave testing so we can look at acceleration
- Major timeline
- Access wind tunnel Grace Dertinger (RIT Alumni)
|
Avionics | - Rough block diagrams
- onboarded some members
- Been working on selecting components
- Worked on string library and networking stack
|
| - Final check block diagrams
- Power allocation for power mod
- Major timeline
- Ave bay 101
|
Reaction Wheel | - Alan joined and he is going to help with machining
- Measurement filtering
|
| - Set up Major timeline
- Measurement filtering
|
Other |
|
| |