Subteam | Updates | Boulders and Grenades | Action Items |
---|
Structures | - Wound body tube
- Took measurements of surface profile
- Looked into nose cone mold - PVA $40 / .5 kg
| - Recovery may need more room in Openrocket
- Motor choice?
| - CDR slides
- figure out open rocket
- Need to order FG tubes, couplers, eyebolts, CF weave
- Grace look into PVA printing
|
Analysis | - HPR Calculations
- Started CFD
- Started tensile testing summary for Carter
| | - CDR slides
- Finish summary
- CFD
|
Avionics | - Most CDR slides completed
- Mostly just structure related slides
- CAD nearly completed. Doing FEA soon for the CDR slides
- We ordered stuff
- Flight Computers
- Trackers
- Batteries
- XT30 Connectors
- $829.01
| | - CDR Slides
- Interfaces
- Flight Conditions
- FOS (Internal Frame FEA)
- Analysis/Spec
- Risk Level Assessment
- Design Risks
- Review and refine CDR slides
- Continue backpain development
|
Payload | - Started CDR
- Decided on Cam Wheel
- 3D printing model
- Will working on CFD
- doing load cell to measure force on airbrake fins (possibly on streamer)
| | - CDR slides
- 3D print finish
- Ghant chart check - on schedule
|
Reaction Wheel | - Demonstrator mechanical components
- wheels done for IREC models
- started software integration for desktop demo
- CDR slides
|
| - Full integration
- Finish CDR slides
|
Recovery | - Looked through current recovery status, all looks good
- OR sim for streamer is nice
- Relevant calcs in HPR calcs spreadsheet all look good
- Worried about having enough space in rocket to fit recovery system
- Adding space reduces apogee significantly
| Figuring out how much room I can have in rocket
| - CDR slides
- Update Asana
- Vibe
|