Subteam | Old Items | Week Progress | Action Items |
Structures | - order shrink tape
- order CF
- Wind last R&D tube
- tensile samples finished
- CFD for Payload
- FEA for thrust plate and motor retainer
| - Last R&D wind with shrink tape complete
- rocket poxy tensile samples made
- Bulkhead FEA complete
- ordered 12 lbs CF (6 lbs 6k and 6 lb 5 k) and 4 lbs FG (plus some) and eyelets
- ~$125
- should have CF this weekend
- sollercomposites
| - start finishing process
- thrust plate and motor retainer FEA
- go to furniture lab
- ASTM standard on fixturing for lap shear/composites
- condense research on finishing and tow contacts on drive
- Meet with Humphrey about training on fixturing/testing Grace Dertinger (RIT Alumni)
- order more shrink tape 220R
|
Avionics | - order electronics
- sort out av bay design problems
- figure out battery situation
- breakout boards for GPS and XBee
- Backplane PDR
- schematic capture
| - picked out batteries
- not using XBee
- GPS breakout board being reviewed tonight
| - electronics order tonight
- talk to mike about about delrin
- schematic capture
- order more breakout boards
|
Payload | - Brainstorming session on Sat.
- Electronics PDR on Sat
- Finalize sensors
| | - Finish up CAD and CFD for chosen payload
- Finalize sensors - may change with layout
|
Reaction Wheel | - finish block diagram
- MOI calculation
- Pick out motor and driver with Billy
- modify motor mounts
| - block diagrams complete
- MOI calc complete
- motor chosen
- slightly more expensive
- ~$200 motor assembly
| - PCB for demonstrator
- structures for desktop demonstrator
- CAD for L1 model started
- Finish magnetometer calibration
|
Recovery | - order tender descender
- order parachutes and streamer
|
| - order tender descender
- order parachute and streamer
- order shock chord
- order hardware
|
Other | |
| - CDR Template
- Infor on dates and what has to be turned in
|