3/23/2023

This Confluence space has been migrated and is no longer current. The content on this space will no longer be accessible after July 1, 2026.

3/23/2023

Subteam

Updates

Action Items

Subteam

Updates

Action Items

Structures

  • CNC machining - thrust plate and motor retainer and lower bulkhead

  • Going to Dragonplate tomorrow

  • scraping first nose cone mold 

  • upper bulkhead 

  • nose cone mold

  • nose cone layup

  • cut airframe

  • 3d print fin support ring

  • machine nose cone tip

  • machine nose cone bulkhead

  • machine fin support bars

  • assemble fin/boat tail assembly

  • cut centering rings

  • order motor tube

  • assembly booster

  • insert keying geometry

  • machine charge caps

  • drill mounting/vent holes

Avionics

  • Frequency Allocation form filled out

  • uhhhhhhhhhhhhhhhhhhhhhhhhhhhhh

  • watermelon

  • Can't completely test BRB battery life. Need to find Baofeng chargers

  • Test pressure sensing for RRC3s

  • Find/Buy more Baofeng chargers

  • Charge Baofengs

  • Test BRB battery 

  • cook

  • Play DOOM on the ground station (train avi people going to IREC)

Backplane

  • schematics or some shit

  • All (important) sensors done

    • Temperature sensors can be done this week

 

Recovery

  • parachutes in

  • James happy

  • Ematch party (my parents aren't home)

  • Put the other two TD-2s together, and then take them apart explosively

Payload

 

 

Things to order double of

 

streamer

parachute

RRC2L

2x BRB

2x RRC3

5 SCRAP

5 BACKPLANE

BATTERIERS

RECOVERY JERKY

R