Insert timeline:


Sub teamLast Week Action ItemsWeekly UpdateAction ItemsBlockers
Structures
  •  sand and additional coat on tube
  • order 3 yds of CF from composite envisions 
  • search for dragonplates
  • Alex Durand (RIT Student) layup logistics
  • sanded tube - need to put more epoxy
  • FG NoseCone
  • Writeup being written
  • another layer of epoxy on tube
  • Brainstorming session on nose cone
  • Finish CAD
  • Work on FDR
  • Work on Progress Report
  • 2 bulkheads complete
  • check basement for thrust plate stock
  • order more stock
  • Alex Speyer (RIT Student) call dragonplate
  • Grace Dertinger (RIT Alumni) email carter about bulkhead test
  • nose cone mold procedure
COTS Avionics
  • Figure out wires and connectors
  • Bug fix on software
  • Define antenna placement
  • Define vent holes
  • Order wires and connectors
  • waiting for LCD
Backplane
  • schematics done sat start layups
  • Feb 11th checkpoint
  • Feb 18th final layouts 
  • Ironing out schematics - moving forward with layouts
  • Av Bay layout finalized
  • Finalize layout and schematics
  •  

Payload
  • CAD finished this weekend
  • Finished airbrake CAD 
  • 3d printed airbrake and tested motor
  • Hooked up load cells and tested weights
  • Finished electronics placement
  • Order Line cutters @Louis Fleisher (lff8659)
  • What to make and not to make Grace
  • FEA on snatch force with high FOS
  • CD of airbrake 1.07
  • Order batteries Louis
  • Antennas Louis
  • Connectors from scrap to computers (JST 2mm pig tail) Louis
  • Mount Big red B with hardware/holes


  • Mount Scrap with hardware/holes then double check with Jim Jonah
  • Mount flight computer with hardware/holes Riley
  • Battery mounts Hayden
  • Make sure we have access to screw switches Josh
  • Order hardware Grace/Louis @Louis Fleisher (lff8659)
  • Stock in basement Grace
  • Look into making our own chute bag Jonah/Louis/Leo/Josh
  • Sew chute bag 
  • Look into reefing Leo
  • FEA on snatch force check Leo/Jonah/Hayden/Riley for training
  • Order Screw Switches (buy from Florida) Louis
  • Have avionics team check schematic/layout of scrap this Sunday Jim
  • Edit scrap from feedback Jim
  • Final battery connector check Jim
  • order Louis
  • send stuff to send cut send
  • order batteries

Analysis
  • Payload FEA
  • Make 5 min training
  • Payload CD FEA done
  • 5 min training complete

(smile)(wink)(big grin)(tongue)(sad)

  • Update RASAero
  • Update current openrocket to newer openrocket
  • Document CD simulation/process

Reaction Wheel



Recovery
  • Prep TD-2 for testing
  • Test TD-2
  • Wait for rockeyman

Still waiting on chutes

need me ematches

Blow stuff up this sunday???

  • Get some ematches through any means necessary
  • Test TD-2
  • Continue waiting for my lover rocketman to return from war with my parachutes

Other:
  • Started soller composites thank you video
  • finalizing video challenge music
  • DRIs look at Openrocket 
  • Alex Speyer (RIT Student) call dragonplate
  • write video challenge script once music is set
  • Reach out to CAB (Holly Files) about fundraising ideas?
  • video challenge music
  • need more video/photos of wind (finished tube)